Replacement of bin store gates due to storm damage for a client in Accrington.
Installation of advertising banners as part of a nationwide advertising scheme for a well known service station brand
Replacement of High level glazing unit with limited access for vehicles, replacement carried out with the aid of rope access team.
Before and after of a refurbishment on a social space carried out at a student accommodation,
Area had started to look aged and students had stopped using the space, uplift of area was carried out with replacement lighting, new wall heaters to match colour scheme installed and power supplies for TV’s relocated, furniture sourced and supplied as requested.
Before during and after of a new electrical supply installed through a GYM floor. Project required a 2 day turn around with strict stipulations on preventing dust or any visible signs of work taking place and with completion by opening time on Monday (7.00am), access was obtained floor protection installed and sealed tent with dust extraction built, 7 meter trench dug through concrete, installation of supply cables within ducting carried out, area backfilled dampcourse installed, flooring re-fitted and completed by 1am Monday morning without mess or disruption.
Before and after of a frame repair after a break in, timber frame had given way after being forced, old frame was removed and replaced with a harder more durable timber to prevent same issue happening in future.
If you have any questions regarding our property maintenance services, please get in touch with a member of our professional team so we can talk about it.
Davies Commercial Property Maintenance
Copyright © 2022 Davies Commercial Property Maintenance - All Rights Reserved.
Powered by GoDaddy Website Builder